After-the-fact permits
I Built My Garage Without a Permit. Now What?
By Chad Ruppert
What to do if a detached garage was built without a permit and the municipality now requires drawings or an after-the-fact application.
After-the-fact permits
By Chad Ruppert
What to do if a detached garage was built without a permit and the municipality now requires drawings or an after-the-fact application.
An after-the-fact permit usually needs drawings that accurately show the garage as built, including size, placement, elevations, sections, and construction details.
Because the garage is already built, reviewers may need clearer information about setbacks, foundation, framing, and whether the structure complies with current requirements.
The goal is to turn an uncertain situation into a complete permit package the city can review. Some cases may still require engineering or additional municipal direction.
After-the-fact permits need calm, organized documentation. We help turn the existing garage into a clear drawing set the municipality can review, while identifying items that may need inspection, correction, or engineering follow-up.
Related permit pages
Local permit drawing support for Calgary detached garage applications.
Learn moreSee what the standard $695 garage blueprint package includes.
Learn moreLearn when larger garages and workshops need custom drawing support.
Learn moreRelated FAQ
Yes. In Calgary and most Alberta municipalities, a detached garage over 10 square meters requires a building permit before construction begins. The permit drawings show the garage location, size, setbacks, elevations, sections, and construction details for review.
A detached garage permit usually requires a site plan, floorplan, elevations, cross sections, and construction details. These drawings help the municipality confirm zoning, setbacks, height, lot placement, and building code compliance.
Standard garage permit drawings start at $695 for detached garages up to 592 square feet. Municipal application and building permit fees are separate and vary by city.
Most standard detached garage drawing packages are completed in 2-3 days after the required project information is received. Custom garages, suites, workshops, and unusual sites may need a quoted timeline.
Oversized garages, backyard suites, garage suites, and custom garage projects are quoted individually. These projects can require additional design coordination, foundation details, engineering, or deeper municipality review.
If the permit reviewer asks for clarification, the drawing set can be revised to respond to municipal review comments. Most comments involve setbacks, site information, construction notes, or missing details that need to be shown more clearly.
A development permit may be required when the garage does not meet land use bylaw rules for setbacks, height, lot coverage, placement, or other site conditions. Many standard detached garages only need a building permit, but the municipality decides based on the property and design.
Permit-ready support
Send the basic project details and we'll help you choose the clearest path: standard package, custom quote, or suite planning. The goal is fewer permit surprises and a drawing set your municipality can review with confidence.